Sanskruti Buildcon
SANSKRUTI
Construction Workflow

Civil Build
Process

A step-by-step engineering driven approach ensuring strength, precision and long-term structural reliability.

01
Excavation

Excavation

Accurate earthwork executed as per foundation layout & depth.

02
Soling

Soling

Stone soling for load distribution & moisture control.

03
PCC

PCC

Plain cement concrete for a clean & stable base layer.

04
Footing

Footing

Engineered footing to safely transfer structural loads.

05
Column

Column

Vertical load-bearing RCC columns with precise alignment.

06
Back Filling

Back Filling

Layered soil filling with compaction for ground stability.

07
PCC Below Beam

PCC Below Beam

Uniform PCC bed supporting beam reinforcement work.

08
Beam

Beam

RCC beams cast for horizontal load distribution.

09
Bolt Fixing

Bolt Fixing

Anchor bolts fixed for structural & machine integration.

Menu